
SECTOR / 01 — INDUSTRIAL
Wind Turbines
From a single high-value machine to a complete production facility. We help define the requirement and develop the right sourcing route.
N/
The equipment index.
Equipment listings
- Enercon, E-40, 2001, 600 kW, 44m Rotor Diameter, 46m Hub Height, Wind Turbines · R-8292
- Vestas, V80, 2003, 2.0MW, Hub-Height 100m · T-2113
- Vestas, V80, 2003, 2 MW, 50 Hz, Hub Height 100m · R-5891
- Vestas, V80, 2004, 2 MW, 50 Hz, Hub Height 100m · R-5892
- Enercon, E48, 2005, 800 kW, Hub Height 50m, Rotor Diameter 48m, 50 Hz · R-5972
- Vestas, V66/1650, 1999, 1650 kW, 65m Hub Height, 66m Rotor Diameter, 690V, 50Hz · R-5973
- Enercon, E-66/20.70, 2003, 2000 kW, 85m Hub Height, 70m Rotor Diameter, 690V/50Hz · R-5974
- Enercon, E40/6.44, 2000, 600 kW, Hub Height 65m, Rotor Diameter 44m, 690V 50Hz · R-5977
- GE, 1.5S, 2000, 1500kW, 65m Hub Height, Steel Tower · M-7251
- Windymotion, 60kW, 30m Hub Height, 25-27m Rotor Diameter, 4 Projects · M-7300
- Vestas, V80, 2008, 2.0MW, 80m Hub Height, 80m Rotor, 690V (New) · M-7468
- Vestas, V80, 2002, 2MW, 50Hz, 690V, Hub Height 67m · M-7479
- Vestas, V80, 2003, 2MW Wind Turbine · M-7486
- W2E, W93, 2011, 2.05 MW, Variable Pitch Wind Turbine · L-3197
- Gamesa, G52, 2003, 850kW, 52m Rotor Diameter, 65m Hub Height · L-3826
- Vestas, V27 and V25, 1990, 225kW, 50Hz, 30m Tower · L-3859
- Bonus, 150 kW, 25m Hub Height, Wind Turbines · L-4163
- Vestas, V47, 2001, 660 kW, 65m Hub Height, 47m Rotor Diameter · L-4567
- Vestas, V47, 660 kW, 47m Rotor, 65m Hub Height, Wind Turbine · L-4985
- GE, 1.5 S, 2002, 1500kW, 70.5m Rotor Diameter, 85m Hub Height · T-4842
- Vestas, V80, 2007, 2MW, 80m Rotor, 67m Hub Height · T-4629
- Nordtank, 150 kW, 1991 to 1993, 30m Tower · L-3910
- Vestas, 0.66MW, 2000, Tube Tower 47m, Hub Height 75m · K-2588
- GE, 1.5s, 2002, 1500kW, 70.5m Rotor Diameter, 65m Hub Height, with Transformer · H-1556
- NEG Micon, M700, 1994, 225 kW, 30m Rotor Diameter, 36m Hub Height · H-1566
- Enercon, E30, 1996, 200 kW, 30m Rotor Diameter, 48m Hub Height · H-1571
ENGINEERING PERSPECTIVE
From equipment to the complete system.
For suitable projects, equipment sourcing can be coordinated with feasibility, layout, auxiliary systems, installation and commissioning scopes under separate professional arrangements.
Explore project services +START THE CONVERSATION
Model number, capacity or a problem to solve — start anywhere.












