
SECTOR / 01 — INDUSTRIAL
Industrial Boilers & Steam Systems
From a single high-value machine to a complete production facility. We help define the requirement and develop the right sourcing route.
N/
The equipment index.
Equipment listings
- Therma Oil Boiler, 1986, 2,500,000 kCal/h, Gas Burner, with Steam Converter · P-7201
- Bono, OMP, 1981, Diathermic Oil Cyclonic Boiler, 3,000,000 kcal/h · L-3308
- Cleaver Brooks, 350 HP, 4 Pass Dry Back, 200 PSI, No. 6 Oil Fired · K-4570
- Cleaver Brooks, CB 700-50, 1993, 50 HP Boiler · K-9302
- Superior, 250 HP, 1990, Gas Oil Boiler, 150 PSI · P-2361
- Cleaver Brooks, CBLE 200-800, 2007, 800 HP, 250 PSIG, Packaged Firetube Boiler · G-2942
- Therma, Multi-Tubular Horizontal Oil Boiler, 2009, 2,500,000 kcal/h, Diathermic Oil Heating, Methane Gas · R-9669
- Clayton, 200 HP, 350 PSIG, Natural Gas, Skid Mounted Steam Generator · R-9859
- Hurst, 50 HP, 150 PSI, 2005, Gas Fired Vertical Steam Boiler · R-9861
- Coal/Biomass Fired Steam Boilers, 94 TPH, 1995, Multi-Solid Fluidized Bed, 90.7 Bar · S-1211
- Thermax Boiler, 2006, 14.5 TPH, Biogas, 46 kg/cm2 · S-1222
- Cleaver-Brooks, 300HP, Steam Plant Boiler Room, 2 Units · T-1113
- TFU, Turboflow, 2012, Biomass Boiler, 55 Tons/Hour, 60 Bar, 450°C · R-9923
- Fluid Bed Boilers, 13.2MW, Biomass Fired, Unused · R-6325
- NovaStar, BG100, Pellet Steam Boiler, New, 500kg/h, 0.7MPa (New) · F-1207
- Hurst, Dual 600 HP, 2005, 20700 lbs/hr, 150 PSIG, Wood Fired Boiler System · T-3442
- Hurst, 1160 HP, 2005, 40000 lbs/hr, 200 PSIG, Reciprocating Grate Combustion System · T-3443
- Hurst, Hybrid Wood/Biomass Boilers, 2005, 41400 lbs/hr, 1200 HP, 150 PSIG · T-4858
- Hurst, 1500 HP, 2008, 100,000+ PPH, 150 MAWP, Biomass Steam Boiler Plant · T-5916
- Hurst, HYD9750-450-1, 2009, Hybrid Biomass Boiler, 1500 HP, 1.0 MW Erie Back Pressure Turbine, 51750 lbs/hour · T-6433
- Hurst, Biomass Steam Boiler Plant, 103,500 lbs/hr, 1500 HP, 150 PSI · T-6434
- Wellons, 300 HP, 450 PSI, Biomass Boiler System, 2012 · TT-6552
ENGINEERING PERSPECTIVE
From equipment to the complete system.
For suitable projects, equipment sourcing can be coordinated with feasibility, layout, auxiliary systems, installation and commissioning scopes under separate professional arrangements.
Explore project services +START THE CONVERSATION
Model number, capacity or a problem to solve — start anywhere.












